全国品茶信息_全国高端空降联系方式_空降24小时快餐电话_全国空降同城微信电话号码

CN

About Us

< About Us
Development History
June 24

All units of the Three Gorges-Gezhouba Cascade Hydropower Station were in operation for the first time, plus the two units of underground power station of Three Gorges put into production this year, the number of units of the cascade hydropower station reached 52, with maximum output reaching 22,130 MW, creating two new records for the number of units in operation and power generation output since the establishment of Three Gorges-Gezhouba Cascade Hydropower Station.